1 - EARTHWORK |
|
Sl No |
Description |
Unit |
Rate |
|
|
|
|
|
|
|
|
Notes : |
|
|
|
|
|
1 |
For items of Site Clearance & Earthwork not included in Part D, |
|
|
|
please refer to respective chapters under Part B. |
|
|
|
|
|
|
|
127 |
Earthwork in excavation to get the desired levels and areas and
dressing of the surface by manual means including disposal of
excavated earth by using it for filling and dressing wherever
required within a lead of 15m and lift upto 1.5m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(a) |
Ordinary soil |
cum |
Rs.72.40 |
|
|
|
|
|
(Rupees seventy two and paise forty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(b) |
Hard soil ( pick work ). |
cum |
Rs.94.50 |
|
|
|
|
|
(Rupees ninety four and paise fifty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(c) |
Soft Rock ( blasting work ). |
cum |
Rs.237.30 |
|
|
|
|
|
(Rupees two hundred thirty seven and paise thirty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(d) |
Hard Rock ( blasting work ). |
cum |
Rs.330.30 |
|
|
|
|
|
(Rupees three hundred thirty and paise thirty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(e) |
Chiselling/ wedging out rock where blasting is prohibited. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(i) Soft Rock. |
cum |
Rs.417.90 |
|
|
|
|
|
(Rupees four hundred seventeen and paise ninety) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(ii) Hard Rock. |
cum |
Rs.625.80 |
|
|
|
|
|
(Rupees six hundred twenty five and paise eighty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
128 |
Earthwork in excavation in foundation trenches etc. not
exceeding 2 meters depth including dressing of bottom and sides
of trenches and subsequent filling as in column foundations,
fence posts, etc. and disposal of all surplus soil as directed
within a lead of 30 metres. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(a) |
Oridinary Soil. |
cum |
Rs.85.00 |
|
|
|
|
|
(Rupees eighty five) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(b) |
Hard Soil ( pick work ). |
cum |
Rs.127.50 |
|
|
|
|
|
(Rupees one hundred twenty seven and paise fifty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(c) |
Very Hard Soil ( jumper work ). |
cum |
Rs.198.30 |
|
|
|
|
|
(Rupees one hundred ninety eight and paise thirty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(d) |
Soft Rock ( blasting work ). |
cum |
Rs.279.00 |
|
|
|
|
|
(Rupees two hundred seventy nine) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(e) |
Hard Rock ( blasting work ). |
cum |
Rs.388.20 |
|
|
|
|
|
(Rupees three hundred eighty eight and paise twenty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(f) |
Chiselling/ wedging out rock where blasting is prohibited. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(i) Soft Rock. |
cum |
Rs.596.30 |
|
|
|
|
|
(Rupees five hundred ninety six and paise thirty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(ii) Hard Rock |
cum |
Rs.944.60 |
|
|
|
|
|
(Rupees nine hundred forty four and paise sixty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
129 |
Filling available excavated earth (excluding
rock) in trenches, plinth, etc. in
layers not exceeding 20 cms in depth, consolidating
each layer by ramming and watering and dressing lead upto 50
meters and lift upto 1.50 meters. |
cum |
Rs.32.00 |
|
|
|
(Rupees thirty two) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
130 |
Providing and filling stone aggregates of size below 90mm in
plinth, etc. in layers not exceeding 20 cms in depth,
consolidating each layer by ramming and watering and dressing
complete. |
cum |
Rs.994.90 |
|
|
|
(Rupees nine hundred ninety four and paise ninety) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
131 |
Providing and filling approved river sand in trenches, plinth,
etc. in layers not exceeding 20 cms in depth,
consolidating each layer by ramming and watering and dressing
complete. |
cum |
Rs.958.50 |
|
|
|
(Rupees nine hundred fifty eight and paise fifty) only. |
|
|
|
|
|
|
|
|
|
|
|